Adding Meter Based Schedule records to a PM Master Job
Perform the following steps to add a Meter Based Schedule Record to a PM Master Job:
NOTE: This can only be done on a PM Master Job with a Schedule Type of Meter
1. Click| Preventive Maintenance | Search
2. Select the PM Master Job ID from the Search Grid
3. Click Schedule Record
The Schedule Records Detail will open
4. Click Add
5. Select a Charge Type from the Charge Type dropdown list
6. Select a Charge To by clickingor and selecting a record
7. Select a Meter from the Meter dropdown list
8. Enter a Last Due meter reading
This should be the last time the PM was performed
9. Enter the Perform Every interval
How often should the PM be performed
10. Select a Mechanic from the Assigned To dropdown list
11. Select a Priority from the Priority dropdown list
12. Select a Work Order type from the Type dropdown list
13. Select a Shift from the Shift dropdown list
14. Click Save to update the PM Master with the new Meter Based Schedule Record
More information on scheduling PM Masters check out Adding Calendar Based Scheduled Record.